Construction of Sogutlukaya Posof 3 HEPP

The HEPP, which has been realized as a group investment, is of 20 MW capacity. Within the scope of the project, ST52 penstock pipes with a diameter of 1.25 m and a length of 300 m have been manufactured.

Client
Yenigun Energy Inc.

Project Location
Ardahan / Turkey

Start Date
05.05.2008

Completion Date 
07.01.2011